What do you do when the Master Suite is accessed through a very narrow hallway and new furniture has no chance of passing through? Deliver it up in the air!
Our innovative contractor utilized scaffolding (usually reserved for installing siding) complete with a foot pump, to raise and lower. The very large pieces of furniture were literally hoisted up to the second floor and entered the room above through the large window.
7 men, not afraid of heights, worked together to bring several pieces of furniture successfully into the space. Teamwork at its best!